Contact

Jiujiang ingshi industry co. LTD

Contact person: gong jiying

Telephone: 15979955959

Address: jiujiang city lushan city cailing road hongfu business opposite

Your location:Home » News

How can ability assure the laid effect of kerb?

How can ability assure the laid effect of kerb? Kerb surface is smooth, colour and lustre is decorous, grain is clear, now the ground of a lot of high quality village, almost all laid on it, it can not only let the road level off, still can have the effect that beautify the environment. So, how can ability assure its good laid effect? In order to ensure the effect of laying kerb, must be polished when processing, make its surface glossiness is good. To make it last longer, pickle the surface to increase wear resistance and make it look more rustic. Good but also for polishing treatment, polished kerb care is very convenient, and can ensure more durable, appearance of color can be maintained for a longer time.


A. The kerb shall be constructed by hanging the through line, indicating the tension of the elevation line according to the top surface of the side plane, laying the side flat stone according to the line code, and the side flat stone shall be straight, and the side top line shall be straight, smooth and smooth, without any high and low wrong tooth phenomenon, no upper and lower wrong platform, internal and external wrong tooth phenomenon.


B. The kerb shall be built with block masonry, and the block masonry shall be dense. It is strictly prohibited to build with plug joints;


C. The dislocation of kerb joints shall not exceed 1mm; Side stones and flat stones must be evenly slotted in the middle.


D. The size and finish of the kerb shall meet the design requirements. The appearance is beautiful, the side stone of the part of the bend should be specially processed according to the design radius of the bend stone, masonry to ensure the linear smooth, smooth, close joint. The curved side stone must be polished after artificial fine chiseling.


E. The kerb back should also be rammed with the ramming width not less than 50mm and thickness not less than 15mm.


F. Kerb jointing: when jointing, hang the thread again. Remove the sundries in the side stone joints and clean them.


G. The kerb is jointed and properly watered after installation.


Pre page:About the color difference of stone    下一篇:无